Pattullo Bridge – Surrey, BC
The project is located on Hwy 1a over the Fraser River connecting Surrey, BC with New Westminster, BC. The bridge structure is a major highway structure between the two cities in Greater Vancouver.
The high volume traffic was never impacted during the daytime hours; all overhead work was completed in the evening with detailed traffic controls in place. The owner’s established the contract consultant (Buckland Taylor) the owner of the structure was Trans Link. The specification called for the center span (450′) and the two-anchor arm spans (350′) be sandblasted and painted.
The specifications called for an SSPC-Guide 6 – Class 1a containment system, SSPC-SP10 (Near White Blast), International Paints (organic zinc, epoxy, urethane) coating system be applied. All large seams and connections required one coat of pre-primer penetrating sealer material.
Our firm provided third party inspection (Two NACE Certified Coating) inspectors to Clara Industrial Services Ltd. for the duration of the project. MISCO provided Quality Control Management using current ISO inspection standards. The project was completed on schedule and met the requirements of the specification as specified. The project has a five (5) warranty requirement.
Elevated Potable Water Tower – Belleville, ON
The project is located in East-Central Ontario, Canada. MISCO Inspection & Consulting provided the contract administration, specifications, recommendations (low bid), NACE Inspection and Warranty Review.
MISCO Inspection & Consulting provided; Project Management, Specifications, Third Party NACE Inspection, and warranty inspection for the duration of the project.
The project consisted of 750,000 I.G. Weld Steel Multi-Legged Potable Water Storage Tower. The specifications called for full removal of the existing coating, lead abatement, surface preparation (SSPC-SP10 – Near White Blast) quality, Ameron (Inorganic Zinc, Epoxy, Urethane) coating system be applied to all exterior structural steel surfaces.
Specification called for full OH&S Safety Upgrades, Signage and illumination. The project was completed on time and on budget.