Elevated Potable Water Tower – Chesterville, ON

The project is located in Eastern Ontario, Canada. MISCO provided the contract administration, specifications, recommendations (low bid), NACE Inspection and Warranty Review.

MISCO Inspection & Consulting provide Third Party NACE Inspection services for the duration of the project. The project consisted of 125,000 I.G. Weld Steel Multi-Legged Potable Water Storage Tower.

The specifications called for overcoating the existing coating, surface preparation (SSPC-SP11) quality, ICI/Devoe (Penetrating Sealer, Epoxy, Urethane) coating system be applied to all exterior structural steel surfaces. Specification called for full OH&S Safety Upgrades, Signage and illumination.

OCWA Agency and Township of North Dundas requested proposals, condition assessment, specifications, tendering, project management, inspection and warranty inspection of the project.

The contractor JDCMI – Cambridge provided full overcoating and engineered safety upgrades and excellent quality of work on the project. The project was completed on time and on budget.

 

Location: Chesterville, ON
Timeline: 2006
Value:
Contractor: JDCMI